Fee Schedule

Construction Costs

Construction costs for all new buildings and structures will be determined from values as listed in the most current ICC Building Valuation Data Report. ICC Building Valuation Data is updated every six months. The permit fee is based on the entire "Estimated Cost of Construction." Proof of costs is a signed contract.

Permits Fees

Please note that there will be some fee changes on July 1, 2021.

Permit holders retain rights granted under the permit therefore no permits are transferable. For all permits (building, gas, plumbing or wiring) there will be a charge of fifty dollars ($50) for every re-inspection necessitated by the faulty or illegal installation or not in conformance with requirements of Massachusetts codes. The fee shall be made before any re-inspection is scheduled. Any work started before applying for and obtaining a permit in violation of state code, will be charged two times the permit fee.

Building - Residential
FeeMinimum
1 or 2 Family Residential Construction

$10.00 per thousand of contract cost

$50.00
Renewable Energy (PV, Wind, Hydro) Storage Excluded$0.03 per watt Direct Current$50.00 
Building - CommercialFeeMinimum
All Commercial Construction
$10.00 per thousand of contract cost 
$100.00
Suppression, Fire Alarm, HVAC, Sheet Metal and/or Mechanical   
$10.00 per thousand of contract cost 
$100.00 if a permit is associated with an active building permit, $50
Building - Miscellaneous
Fee
Minimum
Demolition - Residential$10.00 per thousand of contract cost$50.00
Demolition Residential Accessory greater than 200 square feet$25.00N/A
Demolition - Commercial$10.00 per thousand of contract cost$100.00
Solid Fuel, Wood/Coal Stoves; Fireplaces$50.00N/A
Pools (Above Ground)$50.00N/A
Pools (In-Ground)$100.00N/A
Amusements

$15.00 per booth and/or ride

$100.00
Fences$25.00N/A
Tents Residential$50.00N/A
Tents (Non-residential)$100.00 per yearN/A
Occupancy Application to Occupy Existing Space$50.00N/A
Occupancy
Fee
Occupancy and Use Certificate to occupy existing space$50 when no building permit is required
Occupancy and Use Certificate to occupy new spaceFee included with building permit for new construction
Temp Certificate of Occupancy Residential$50 per 30 days, maximum 90 days
Temp Certificate of Occupancy Commercial$200 per 30 days, maximum 90 days
Gas (Residential)
Fee
New Construction: 1- or 2-Family Residence$150.00 per unit
New Construction: 3 or more Units$100.00 per unit
Appliance Replacement/Addition $40.00
Each Additional Appliance

$15.00 per appliance

Gas (Commercial & Industrial)
Fee
Minimum
All Commercial Gas Work
$10.00 per thousand of contract cost   
$100
Plumbing (Residential)
Fee
New Construction: 1- or 2-Family Residence$150.00 per unit
New Construction: 3 or more Units$100.00 per unit
Alterations (New/Replacements)$40.00; plus $8.00 per fixture
Trailer Water/Sewer$40.00
Plumbing (Commercial & Industrial)
Fee
Minimum
All Construction
$10.00 per thousand of contract cost
$100
Wiring (Residential)
Fee
Minimum
New Construction: 1- or 2-Family Residence$150.00 per unitN/A
Service Change$50.00 per 1st 100 amps plus $25 per additional 100 ampsN/A
Renewable Energy Permit$0.03 per watt Direct Current$50.00
Oil or Gas Burner, appliances, swimming pool

$75.00 each

N/A
All other electrical work $10.00 per thousand of contract cost$75.00
Wiring (Commercial & Industrial)
Fee                                          
Minimum
New Construction/Addition$10.00 per thousand of contract cost$100
Carnivals$250.00N/A
Signs and Billboards$75.00 for each signN/A
Temporary Service$50.00N/A
Renewable Energy (Not Storage)$0.03 per watt Direct Current$100
Institutional (Maintenance Permit)$250.00 annuallyN/A