Skip Navigation

Like Us On FacebookFacebook

Marlgorough Massachusetts
This table is used for column layout.
Citizen's Action Center
  • Pay Bills Online
  • Subscribe to News
  • Report an Issue
  • Provide Feedback
  • Trash & Recycling
  • Stay Connected
  • Contacts Directory
  • Forms
  • GIS/Mapping
  • Employee Portal
  • Public Records
 
ED 2014-20 Documents

The work to be performed under this Contract consists of, but not limited to, the installation of new 8” ductile iron Class 52 pipe, installation of gate valves as shown on the construction drawings, utilize the existing force main as a by-pass until new main is activated, cut, cap and abandon existing force main in place at the time of new force main is tested, passed/activated, test pits, sawcutting, temporary plating, bedding, excavation support, backfilling, compaction, restoring the excavation trench area with pavement back to finish grade as shown on the design plans/details,  temporary paving work  will  be  performed  on  a  daily  basis  unless  otherwise  approved  by  the Engineer and the contractor will be responsible for removing the 3” temporary trench pavement/4” of gravel base and replacing it with 3.5” of Hot Mix Asphalt Base Course, 2” of Hot Mix Asphalt Binder Course and 1.5” of Hot Mix Asphalt Top Course on Bolton Street.

Document Name
File Type
Version
PDF
1.0
 

Marlborough City Hall, 140 Main Street, Marlborough, MA 01752 | 2015 City of Marlborough - All Rights Reserved
Virtual Towns & Schools Website